Oracle® Switch ES2-72 and Oracle Switch ES2-64 Service Manual

Exit Print View

Updated: April 2015
 
 

Power On a Power Supply

  1. Reconnect the power cord to the power supply.
    image:Figure shows the power cord being installed.

    The AC LED lights green to indicate the power supply is connected to line power. A moment later, the OK LED lights green to indicate the power supply is fully operational.

  2. Verify that the switch has power.

    See Check Switch Status (LEDs).

Related Information