Replace the Fabric Interconnect F1-15 QDR Fabric Board
The Fabric Interconnect F1-15 Fabric Board is on the rear of the chassis. To
replace the Fabric Interconnect F1-4 Fabric Board, you will need a #2
Phillips-head screwdriver.
Note -
This procedure is applicable to replacing a QDR Fabric Board with another
QDR Fabric Board. If you are upgrading from a non-QDR Fabric Board to a QDR
Fabric Board, use the procedure documented in
Upgrading a DDR Fabric Board to a QDR Fabric Board.
To replace the Fabric Interconnect F1-15 QDR Fabric Board, follow this
procedure:
-
Power down the Fabric Interconnect.
-
Disconnect all cables attached to the server ports, as well as any other
cables that could interfere with the Fabric Board's removal.
-
Using a screwdriver, loosen the captive screws in the release levers by
turning them counterclockwise (1). See Unlocking the Fabric Interconnect F1-15 QDR Fabric Board.
Figure 75 Unlocking the Fabric Interconnect F1-15 QDR Fabric Board
-
Grasp both of the Fabric Board's release levers, and simultaneously swing
them outward (2).
-
Grasping both of the release levers, slide the Fabric Board out of the
chassis. See Removing the Fabric Interconnect F1-15 QDR Fabric Board.
Figure 76 Removing the Fabric Interconnect F1-15 QDR Fabric Board
-
Remove the QDR Fabric Board from the packaging, and orient the module so
that it is right side up.
-
Orient the QDR Fabric Board so that the sheet metal surface is on the
bottom, and pivot the QDR Fabric Board's handles so that they are pointing
directly towards you—not flush with the module.
At the far end of each of the Fabric Board's handles, notice there is a
notch. This notch will meet a part in the chassis, and allow you to lock the
Fabric Board into the system midplane and power channel.
-
Supporting the QDR Fabric Board under the sheet metal bottom, hold the
Fabric Board level and align it with the empty Fabric Board bay in the
Fabric Interconnect. Inserting the QDR Fabric Board into a Fabric Interconnect F1-15 shows aligning and inserting the QDR Fabric
Board.
 | Caution -
Pay attention to the leading edges of the Fabric Board—the edges
that will contact and insert into the chassis first. These edges must be
kept horizontal. If you tip one side of the Fabric Board, it possible to
insert the Fabric Board incorrectly. Make sure you hold the Fabric Board
level while you insert it.
|
Figure 77 Inserting the QDR Fabric Board into a Fabric Interconnect
F1-15
-
When the Fabric Board is properly aligned, gently slide it in until you
feel some resistance, then check the notches at the end of the Fabric
Board's handles to make sure they are contacting the guides on the inside of
the chassis.
 | Caution -
Do not force the Fabric Board into place. If it does not slide in
easily, remove it and attempt to insert it again. Make sure that the
leading edges are level, and you are keeping the Fabric Board level
while you slide it in.
|
-
When the notches and guides are properly positioned, press the Fabric
Board's handles inward to seat the Fabric Board (1) as shown in Seating the QDR Fabric Board into a Fabric Interconnect F1-15. The Fabric Board is
properly seated when it and its handles lie flush against the chassis.
 | Caution -
Do not force the levers. They should glide easily when properly
aligned. If you feel uneven resistance or the release levers do not move
easily, gently swing the levers away from each other, partially remove
the Fabric Board, and attempt Step 8 through Step 10 while
paying attention to how the release levers contact the edge of the
chassis.
|
Figure 78 Seating the QDR Fabric Board into a Fabric Interconnect F1-15
-
When the release levers have correctly locked the QDR Fabric Board into
the chassis, use the screwdriver to secure the captive screws in the release
levers (2).
 | Caution -
When tightening screws, make sure to tighten them to lightly snug. Do
not overtighten screws or they can break.
|
-
Reconnect the Fabric Interconnect to facility power, then power on the
Fabric Interconnect, and allow it to completely boot up.
The Fabric Board will boot, and when the board completes is bootup and
passes to runtime, the Power LED will glow. The Power LED does not glow
until the Fabric Board is in runtime.