oracle home
Oracle Fabric Interconnect Hardware User's Guide
Exit Print View
Search Term
Search Scope:
This Document
Entire Library
Documentation Home
»
Oracle Virtual Networking Documentation
»
Oracle Fabric Interconnect Hardware User's Guide
»
Index C
Updated: July 2016
Oracle Fabric Interconnect Hardware User's Guide
Document Information
Using This Documentation
Product Documentation Library
Feedback
Installing the Fabric Interconnect
Oracle Fabric Interconnect Overview
Oracle Fabric Interconnect F1-15
Oracle Fabric Interconnect F1-4
Site Preparation
Fabric Interconnect F1-15 Site Criteria
Fabric Interconnect F1-4 Site Criteria
Unpacking the System
Unpack the Fabric Interconnect F1-15
Unpack the Fabric Interconnect F1-4
Installing the Fabric Interconnect F1-15 in a 4-Post Rack
Fabric Interconnect F1-15 Locking Modules
Required Equipment
Pre-Installation Considerations
Install the Fabric Interconnect F1-15
Attach the Right Angle Bracket
Attach the Right Angle Bracket in a 27” Sun/Oracle Rack
Installing the Cable Management Assembly
Required Equipment
Install the CMA
Installing the Fabric Interconnect F1-4 in a 4-Post Rack
Fabric Interconnect F1-4 Locking I/O Modules
Power Cord Management
Required Equipment
Pre-Installation Considerations
Install the Fabric Interconnect F1-4
Attach the Right Angle Bracket
Attach the Right Angle Bracket in a 27-Inch Sun/Oracle Rack
Understanding Chassis Components and Indicators
Fabric Interconnect Chassis Components
Fabric Interconnects
Fabric Interconnect Control Panel
Fabric Interconnect I/O Modules
10 GE Ethernet I/O Module LED Codes
10-Port GE Ethernet I/O Module LED Codes
4-Port GE Ethernet I/O Module LED Codes
Fibre Channel I/O Module LED Codes
Fabric Interconnect Front Panel LED Codes
Installing an I/O Module
Using the I/O Module Lock
Install I/O Modules in a Fabric Interconnect F1‐15
Install I/O Modules in a Fabric Interconnect F1‐4
Installing a Host Channel Adapter
Install a Host Channel Adapter
Connecting the Fabric Interconnect to Other Equipment
Connecting to Client Servers
Fabric Interconnects
Connecting to Switches, Routers and Other Equipment
Connect the 4-Port 10 GE Module to Other Equipment
Management Module Connections
Connecting the Management Port to a DB9 Serial Port
Connect to a Fabric Interconnect F1-15's Management Module
Connect to a Fabric Interconnect F1-4's Management Module
AC Power
Connect Power to the Fabric Interconnect F1-15
Connect Power for the Fabric Interconnect F1-4
Performing Initial Configuration
Initial Configuration
Run the Oracle Configuration Wizard
Change the Root Password
Performing Service Tasks
Compatibility of Fabric Interconnect F1‐15 and F1-4 Hardware
The ID LED
Activate and Deactivate the ID LED
Removing Fan Modules
Remove Fabric Interconnect F1-15 Fan Modules
Remove Fabric Interconnect F1-4 Fan Modules
Insert a Fabric Interconnect F1-4 Fan Module
Removing Power Supplies
Remove Fabric Interconnect F1-15 Power Supplies
Remove Fabric Interconnect F1-4 Power Supplies
Install Fabric Interconnect F1-4 Power Supplies
Replacing a Fabric Board
Replace the Fabric Interconnect F1-15 DDR Fabric Board
Replace the Fabric Interconnect F1-4 DDR Fabric Board
Insert a Fabric Interconnect F1-4 DDR Fabric Board
Replace the Fabric Interconnect F1-15 QDR Fabric Board
Replace the Fabric Interconnect F1-4 QDR Fabric Board
Upgrading a DDR Fabric Board to a QDR Fabric Board
Upgrade a Fabric Interconnect F1-15 to a QDR Fabric Board
Upgrade a Fabric Interconnect F1-4 to a QDR Fabric Board
Removing and Installing I/O Modules
Remove Fabric Interconnect F1-15 I/O Modules
Install Fabric Interconnect F1-15 I/O Modules
Upgrade to a 4-Port 10 GE Module
Removing and Inserting Fabric Interconnect F1-4 I/O Modules
Remove Fabric Interconnect F1-4 I/O Modules
Install Fabric Interconnect F1-4 I/O Modules
Removing and Installing the Management Module
Remove a Fabric Interconnect F1-15 Management Module
Install a Fabric Interconnect F1-15 Management Module
Removing and Installing the Fabric Interconnect F1-4 Management Module
Disable the USB Drive on the Management Module
Removing and Installing the Front Panel Assembly
Remove and Install a Fabric Interconnect F1-15 Front Panel Assembly
Remove a Fabric Interconnect F1-4 Front Panel Assembly
Install a Fabric Interconnect F1-4 Front Panel Assembly
Replacing an FP-1 Front Panel with an FP-2 Front Panel
Installation Considerations
Power Down the Oracle Fabric Interconnect
Uncable the Oracle Fabric Interconnect
Removing the Oracle Fabric Interconnect from the Equipment Rack
Prepare for the Procedure
Remove the Oracle Fabric Interconnect from a Four-Post Equipment Rack
Remove the Oracle Fabric Interconnect from a 27-Inch Sun/Oracle Equipment Rack
Remove the Old Front Panel
Remove the Old Mounting Brackets
Install the New Mounting Brackets
Install the FP-2
Install the Oracle Fabric Interconnect
Return the Oracle Fabric Interconnect to Service
Cables and Connectors for 4-Port 10 GE Module
Glossary
Index
Index Numbers and Symbols
Index A
Index B
Index C
Index D
Index F
Index H
Index I
Index L
Index M
Index O
Index P
Index R
Index S
Index U
Index W
Please tell us how to improve our documentation:
Provide more details about the topic
Fix incorrect information
0 of 500
Provide missing information
0 of 500
Provide translated version
--Select--
Deutsch
Español
Français
Italiano
Português Brasil
日本語
한국어
简体中文
繁體中文
Other Language
Other
0 of 500
Terms of Use |
Your Privacy Rights
Thank you for your feedback! If you want to participate in content improvement and share additional information, please click Feedback button.
Rate this document:
Print View
Language:
English
C
cables, 4-Port 10 GE module
Cables and Connectors for 4-Port 10 GE Module
cabling
Connecting the Fabric Interconnect to Other Equipment
changing password
Change the Root Password
chassis
components
Fabric Interconnects
dimensions
depth
Fabric Interconnect F1-4 Site Criteria
Fabric Interconnect F1-15 Site Criteria
height
Fabric Interconnect F1-4 Site Criteria
Fabric Interconnect F1-4 Site Criteria
Fabric Interconnect F1-15 Site Criteria
Fabric Interconnect F1-15 Site Criteria
width
Fabric Interconnect F1-4 Site Criteria
Fabric Interconnect F1-15 Site Criteria
clearance
service
Fabric Interconnect F1-4 Site Criteria
Fabric Interconnect F1-15 Site Criteria
client servers
Fabric Interconnect F1-4 Site Criteria
Fabric Interconnect F1-15 Site Criteria
components
chassis
Fabric Interconnects
control panel
Fabric Interconnect Control Panel
I/O modules
Fabric Interconnect I/O Modules
configuration wizard
Initial Configuration
connecting
AC power
AC Power
requirements
AC Power
client servers
Fabric Interconnects
Fabric Interconnect
Connecting the Fabric Interconnect to Other Equipment
fibre channel devices
Connecting to Switches, Routers and Other Equipment
Management module
Connect to a Fabric Interconnect F1-15's Management Module
routers
Connecting to Switches, Routers and Other Equipment
SAN resources
Connecting to Switches, Routers and Other Equipment
switches
Connecting to Switches, Routers and Other Equipment
connectors, 4-Port 10 GE module
Cables and Connectors for 4-Port 10 GE Module
control panel
Fabric Interconnect Control Panel
cooling
Fabric Interconnect F1-4 Site Criteria
Fabric Interconnect F1-15 Site Criteria
copper cables, 4-Port 10 GE Module
Cables and Connectors for 4-Port 10 GE Module
Previous
Next