Go to main content

Oracle® Server X7-8 Installation Guide

Exit Print View

Updated: April 2018
 
 

Cabling Requirements

Read the following cable requirements for connecting the server.

  • Minimum cable connections for the server:

    • At least one server on-board Ethernet network connection (NET port)

    • Serial management port (SER MGT): SP local connection for Oracle ILOM boot messages

    • Power cables for the server power supplies

  • SP management ports: There are two service processor management ports for use with the Oracle ILOM SP.

    • The SER MGT port uses an RJ-45 cable and is always available. This port is the default connection to the Oracle ILOM SP.

    • The network management port (NET MGT) port is the optional connection to the Oracle ILOM SP.

      The NET MGT port is configured to use DHCP by default. To set a static IP address, see Modify Oracle ILOM Network Settings. The SP network management port uses an RJ-45 cable for a 10/100 BASE-T connection.

  • Ethernet ports: The Ethernet ports, labeled NET0, NET1, NET2, and NET3, connect the server to the network. The Ethernet interfaces operate at 100 Mbit/sec, 1000 Mbit/sec, and 10,000 Mbit/sec.

  • USB Ports: USB ports support hot-plugging. You can connect and disconnect USB cables and peripheral devices while the server is running without affecting server operations.

  • AC power cables: Four power supply connectors are available, one for each power supply.

Related Information