Add and remove kits in a shipment
You typically add and remove kits in a shipment when something happens to a kit that was selected for the shipment. For example, when a kit is damaged before it is packed, you can replace it with another kit of the same type. This procedure also applies to rollover studies.
Before adding or removing kits in a shipment consider the notes below:
Caution:
If your study uses an integration with Almac or Fisher Clinical Services for shipments, do not perform the steps below, even if you need to adjust the shipment. Instead, cancel the shipment and either allow the resupply process to create a new shipment the next time inventory runs or create a manual shipment.Note:
Consider the following:- You cannot add or remove kits from a shipment containing pool kits (also known as a pooled shipment).
- If the study doesn't allow shipments with a single kit and you need to remove all but one kit, add replacement kits first, and then remove the other kits. Oracle Clinical One Platform prevents you from removing kits and leaving only a single kit.
- All non-serialized inventory is grouped. Instead of individual kit numbers, non-serialized kits display in the User Interface (UI) as lot numbers followed by the quantity.
Related Topics
Parent topic: Manage shipments