Add a Route Set by Copying an Existing One

You can copy an existing route set to make a new route set.

  1. Expand the Route Manager slider. The Route sets page is displayed.
  2. In the Route sets page, select the route set that you want to copy, and click Lock.
    The lock state toggles from unlocked, indicated by Open lock, to locked, indicated by Locked lock. The name of the user who locked the route set is listed.
  3. With the locked route set selected, click Copy located at the bottom of the page.

    Figure 2-2 Copy Route Set


    Copy Route Set dialog box
  4. In the Copy Route Set dialog box, complete the following fields:
  5. Click OK.