- Owner's Guide
- Site Preparation
3 Site Preparation
Learn about site preparation requirements for the Oracle Database Appliance before installing it into a rack and cabling it.
- Prepare Your Site
Use this procedure before installing the appliance into a rack.
Prepare Your Site
Use this procedure before installing the appliance into a rack.
- Ensure that your site meets the environmental requirements in Environmental Specifications.
- Ensure that your site meets the electrical specifications in Electrical Specifications.
- Ensure that your site has adequate clearance for the shipping containers.
- Allow the equipment to acclimatize to the computer center environment.
If significant temperature differences exist (> 10° C / 18° F) between the new system and the designated computer center, the equipment should be left in its boxes for a sufficient period of time to allow the temperature of the equipment to come to within a few degrees of the computer center.
Caution:
Equipment damage. The system should never be powered on unless it is within the supported operating range (temperature and humidity).
- Open the shipping containers.
You should do this at the location where the system will be installed, but outside of the computer center itself.
Caution:
Equipment damage. Use a separate area in which to remove the packaging material to reduce particle contamination before entering the computer center.
- Check the contents of the shipping container.
Caution:
System failure. All items in a shipment are designed to be used together as a single system. Do not mix components from different shipments; this could cause the system to fail.
It should contain:
Oracle Database Appliance X11-S/X11-L Oracle Database Appliance X11-HA -
Preconfigured system
-
Accessory kit, including:
-
Setup poster
-
Safety and legal documentation
-
Rackmount guide and alignment template
-
Rackmount kit
-
-
Power cords (shipped separately)
-
Shipping kit (optional)
-
The server nodes include:
-
Preconfigured server nodes (0 and 1)
-
Accessory kit, including:
-
Setup poster
-
Safety and legal documentation
-
Rackmount guide and alignment template
-
Rackmount kit
-
Power cords
-
SAS cables, Ethernet cables, cluster cables, and labels are shipped with the storage shelf.
-
-
-
The storage shelf includes:
-
Preconfigured storage shelf
-
Rackmount kit
-
Power cords
-
Cables
-
Setup poster
-
-
If you ordered a storage expansion shelf, it is shipped separately and includes the same list of components as the storage shelf.
-
Parent topic: Site Preparation