Planning Results Pegging DataSet
The Planning Results Pegging Dataset maps Material Requirements Planning supply results to related demand results. The standard Supply Chain Planning Results Workbook uses the Planning Results Pegging Dataset as its source.
Dataset Configuration
To customize the standard dataset, use Save As to create your own version.
Consider the following information before you use or customize the dataset:
-
Enable Material Requirements Planning before you use the dataset.
-
Your role needs the SuiteAnalytics Workbook permission at the Edit level and Material Requirements Planning at the View level or higher. Share the dataset with users who can't access the dataset template.
-
Refresh the planning repository and launch a supply plan to generate planning results.
-
Days Late identifies late supply. Is Allocated shows the allocation status for the pegging row.
-
Bill of materials explosions for work orders and transfer orders can produce rows with the same Internal ID at different assembly or component levels.
-
The Planning Results Pegging Dataset doesn't directly join to Planning Repository Allocation or Supply Change Order.
-
The following table lists the dataset configuration.
|
Root Record Type |
Joined Record Type |
Custom Formula Fields |
Data Grid |
Criteria Filters |
|---|---|---|---|---|
|
Planning Engine Pegging |
|
Days Late |
The following fields are included in the dataset. Planning Engine Pegging record:
|
The following criterion is used to filter the dataset:
|