Planning Results Dataset

The Planning Results Dataset contains individual Material Requirements Planning supply or demand results. Each row represents one planning result, not a supply-to-demand pegging relationship. The standard Supply Chain Planning Results Workbook uses the Planning Results Pegging Dataset, not the Planning Results Dataset.

Dataset Configuration

To customize the dataset, use Save As to create your own version.

Consider the following information before you use or customize the dataset:

  • Enable Material Requirements Planning before you use the dataset.

  • Your role needs the SuiteAnalytics Workbook permission at the Edit level and Material Requirements Planning at the View level or higher. Share the dataset with users who don't have access to the dataset template.

  • Planning results appear after you refresh the planning repository and launch a supply plan.

  • The Planning Results Dataset doesn't directly join to Supply Change Order.

The following table lists the dataset configuration:

Root Record Type

Joined Record Type

Custom Formula Fields

Data Grid

Criteria Filters

Planning Engine Result

Planned Order

-

The following fields are included in the dataset.

Planning Engine Result record:

  • Internal ID

  • Supply Or Demand

  • Supply Planning Run Id

  • Supply Plan Definition

  • Item

  • Location

  • Vendor

  • Supply Start Date

  • End Date

  • Planning Order Type

  • Quantity

  • Planned Order

  • Planned Order: Firmed

  • Planned Order: Released

  • Transaction

  • Source

The following criterion is used to filter the dataset:

  • Supply Planning Run ID is Latest

Related Topics

General Notices