Schedule Alternative Resource More Than Once in Routing Definition

You can schedule alternate resources more than once in a routing operation with the help of different schedule sequence numbers. You can also use the same alternate resource to set up different activities or activities with varying usage rates for the same operation.

Prior to Release 12.2.15, the same alternate resource could be scheduled only once for a given Substitute Group Number, Replacement Group, Basis and Schedule Flag sequence even when the schedule sequence number was different.

This functionality enables you to schedule the same alternate resource multiple times for different activities.

In the following example, TANK is a machine resource and LABOR is a person resource. The TANK is cleaned and later used for mixing activity using the same LABOR resource.

The table shows the alternate resources defined for operation sequence 10.

Resource Resource Type Replacement Group Schedule Sequence Basis Substitute Group Number Schedule Activity Description
LABOR Person 10 10 Lot 10 No Cleaning Person to clean the tank (Setup activity)
TANK Machine 10 20 Lot 10 No Cleaning The tank to be cleaned (Setup activity)
TANK Machine 10 30 Lot 10 Yes Mixing Same tank to be used for mixing (Main activity)
LABOR Person 10 40 Lot 10 No Mixing Same person to perform mixing activity (Main activity)

Steps to Enable

You don't need to do anything to enable this feature.

Key Resources

  • Oracle E-Business Suite News and Information: oracle.com/ebs
  • Oracle E-Business Suite Product Documentation: https://docs.oracle.com/cd/E26401_01/index.htm
  • Oracle University: https://www.oracle.com/education
  • Oracle Support: https://www.oracle.com/support