Add an Assign Activity to the Catch Activity Branch

To add an assign activity to the catch activity branch:

  1. Drag an assign activity into the catch activity block.
  2. Double-click the assign activity.
  3. Concatenate the code, summary, and detail fields of the FaultVar variable to the FaultResponse variable, and click OK. Figure 12-7 provides details.
  4. In the Name field of the General tab, enter a name (for this example, FaultDataForClient).