Correcting Material Consumption Data
As a production manager, you can add or modify material consumption details.
To correct unprocessed material consumption data:
-
Go to Reports > Shop Floor Reports > Work Details.
-
Beside the work detail you want to add or modify, click Edit.
-
Click the Mfg Mobile – Material Consumption subtab.
-
Next to the material consumption details you want to correct, do the following:
Tip:If you want to correct processed data, delete the build first. To access the build, on the Mfg Mobile -Production Reporting subtab, click the transaction link in the Transaction Ref# column. After you delete the build, you can proceed to step 4.a.
-
In the Processed? column, verify that it is set to N.
-
Click Edit.
-
Update the fields, such as the consumption quantity, that you want to correct.
-
-
If you want to correct unprocessed production reporting data, see Correcting Production Reporting Data.
-
Click Save.
-
After you correct all the data on Work Details record, click Edit Work.