Copy an Integration into a Project

You can copy integrations into a project. The integration to copy can be either in a different project (as long as it is marked as globally available) or outside of any project.

  1. In the navigation pane, click Projects.
  2. Click the project name or click Edit icon.
  3. In the Integrations section, click Add if no integrations currently exist or + if integrations already exist.
    The Add integration panel opens.
  4. Copy an integration into a project.

    You can copy an integration into a project. The integration to copy can be available in either of the following locations:

    • In another project.
      1. Ensure that the Search in projects check box is selected. This is the default selection.
      2. Search for or select the project that includes the integration to copy. Besides searching the listed projects, all available projects in Oracle Integration are searched on the basis of full name, partial name, keywords, and description to fetch the data from the server side.
      3. Search for or select the integration to copy in that project. Only the listed integrations are searched. That is, the integrations exposed outside of the selected project are listed upon selection of the project. (Data is only fetched from the client side.)
        Even though the integration to copy is in a project, it must be publicly available. That is, you selected the Available to other projects check box during integration creation or editing under Primary Info Primary information icon in the integration canvas. Otherwise, you receive the following error:
        Either there is no integration available or visible outside the project.

        Integrations in projects in which the Available to other projects check box is not selected are not available for selection.

      4. Click Copy.
    • Globally available (that is, outside any projects). Besides searching for listed integrations, all globally available integrations in Oracle Integration are searched on the basis of full name, partial name, keywords, and description.
      1. Deselect the Search in projects check box.
      2. Search for or select the integration to copy.
      3. Click Copy.