Use Actual Costing in Full Outsourcing Flow with Discrete Manufacturing
Configure Outsourced Manufacturing-Full Outsourcing solution in discrete manufacturing and project manufacturing organizations for all costing methods such as Standard, Average, FIFO, and LIFO.
Prior to Release 12.2.15, the Outsourced Manufacturing-Full Outsourcing solution was available only with standard costing.
Steps to Enable
You don't need to do anything to enable this feature.
Tips And Considerations
- Actual Costing in Full Outsourcing is supported with external Manufacturing Partner organizations only.
- Setup steps for Full Outsourcing with Actual costing are the same as Full Outsourcing with Standard costing.The original equipment manufacturer (OEM) and manufacturing partner (MP) organizations must use the same cost type.
- For Costing related information refer to 12.2.15 Cost Management feature "Use Actual Costing in Full Outsourcing Flow with Discrete Manufacturing"
Key Resources
- Oracle E-Business Suite News and Information: oracle.com/ebs
- Oracle E-Business Suite Product Documentation: https://docs.oracle.com/cd/E26401_01/index.htm
- Oracle University: https://www.oracle.com/education
- Oracle Support: https://www.oracle.com/support