Understanding the Installation
Understanding Management and Power Cabling
Single-Switch Location Guidelines
Attach the Rails to the Switch
Attach Telco Adapters to the Rack Slides
Attach the Rack Slides to the Rack
Install the Switch Into the Rack
Install the Air Duct and Front Support
Attach Data and Management Cables
Prepare the Front Support and Small Air Duct
Verify the DHCP-Assigned IP Address and Host Name
Configure Network Management From the CLI (SER MGT)
Log Into the Oracle ILOM Web (NET MGT)
Log Into the Oracle ILOM CLI (NET MGT)
Log Into the Oracle ILOM CLI (SER MGT)
Change a SEFOS User Privilege Level
Configure Network Management From the Web Interface
Configure Network Management From the CLI
Log Out of the Oracle ILOM CLI
Configuring the SEFOS Environment
Configuring the Switching Feature
Configuring the Routing Feature
Check Switch Status (Oracle ILOM)
![]() | Caution - In a hot-swap replacement, you must install the replacement fan module within 30 seconds of removing the faulted fan module. If this is not possible, first power off the switch by powering off both power supplies. See Power Off a Power Supply. |
The fan should immediately power on.
See Rear Panel LEDs.
If you installed the fan module from the cold aisle, install the air duct and front support. Refer to Switch Installation, installing the air duct and front support.
If you installed the fan module from the hot aisle, install the CMA. See Install the CMA.