Configure Single 8-Socket Server to Dual 4-Socket Server (CRU)
-
Prepare to set up and configure two servers (System A and System B) for independent operation.
-
Determine Oracle Server X8-8 dual 4-socket system (2x4) CMOD CPU module processor and memory population.
Note:
In a dual 4-socket configuration, the two sides of the system can support either identical or different processor SKUs and memory.
In an Oracle Server X8-8 dual 4-socket system (2x4), the System A and System B CMOD processor and memory populations can be dissimilar. Conversion to a single 8-socket system (1x8) may require additional CMOD processor and memory removal and replacement to match all CMODs.
-
Resolve all open problems in the server, server components, and chassis.
-
Verify the System B management ports connectivity on SMOD1 on the back panel, as required.
-
Connect a serial cable between the SP and a terminal device or PC, used for the initial configuration. Attach the serial cable to the System B serial management port SER MGT.
-
Connect an Ethernet cable for the SP to the administration network. Attach an Ethernet cable to the System B SP management port NET MGT.
-
-
Prepare the System B host's network ports.
Connect four Ethernet cables for the host's primary interface to the main network. Attach Ethernet cables to the System B four network ports NET0-3.
The following procedure describes how to configure a single 8-socket system (1x8) to a dual 4-socket system (2x4).