Running a Timing Test
To run a timing test:
- Click Timing test. The Timing Test dialog is displayed.
- Enter the number of times the test is to be performed in the Number of requests field.
- If required, enter a delay in milliseconds between tests in the Interval (ms) field.
- Click Run. The Status area shows the progress of the test, and the results when it is complete.
- If required, click View Chart. The Timing Chart dialog is displayed.