Create a manual shipment
You might need to create a manual shipment if a shipment was damaged at the depot before it was shipped or if another depot requires more supplies sent to their facility.
Tip:
If the study doesn't allow single-kit ordering and you create a shipment with only one kit, Oracle Clinical One Platform adds an additional kit to the shipment. The sponsor specifies whether single-kit ordering is allowed in a study.You can create a depot-to-depot shipment to stage kits at the depot before they're released at a site. To do this, a clinical supply manager or depot user should configure a specific setting called Release for Depot to Depot. For more information, see Manage expiration dates with lots.
Note:
Depending on how kits are designed in your study, a kit type may include information about its block size. If you add a number of kits that is lower than its block size, the system adds additional kits to complete the block. For example, if you include 2 vials in a shipment, the system includes 2 additional vials to complete the block of 4 units.Want to see how to perform this task? Watch the video below.
Next, you must fulfill the shipment and then specify a ship date for
the shipment after it leaves the depot. For step-by-step instructions, see:
Parent topic: Manage shipments