C.3 Configuration at Company Level

In the configuration at Company level (not Branch level), the following options are supported:

  • To configure only one EOD schedule for one or all companies - Configure batch jobs at ALL level with or without having multiple company definitions. If OFSLL is upgraded from earlier to current release version, this helps to continue with existing ALL company level scheduling of batch job run.
  • To configure EOD for each company independently - Define GL date at each Company level to schedule and run batch jobs at each company level. The scheduler changes the GL date of specific company, after successful completion of batch job run.

However in this setup, note that:

  • It is advised to Enable flag at ALL GL date level, but disable batch jobs at ALL level so that scheduler does the rollover of date but does not pick-up batch jobs for EOD run.
  • After EOD run, system rollovers the GL date or ALL company entry, after completion of run of other specific company GL date rollover.
  • Ensure the Company parameter System Under Maintenance is also set to Y for corresponding company during EOD run of same company.
  • Company Start of Business Time can be configured at company level. If the parameter value is set to 0500, it implies that scheduler rollovers the GL date based on this time.
  • System refers the Company Time Zone (new field at company definition page) to identify the time zone in company parameter.

Figure C-2 Configuration at Company Level