6.4 Structure Closure
This topic describes the systematic instructions to close the account structures.
Sweep Structure
- Sweep will not get executed after the Sweep structures are closed.
Pool Structure
- On structure closure authorization, system will immediately liquidate and allocate the interest to all the accounts in the structure.
- System will disable the ‘IC required’ flag from ‘Yes’ to ‘No’ for the Notional Header and will stop doing further interest accruals for the structure.
- During the reopening of the structure, user should update the relevant account groups to the Notional header and system will resume interest accruals for the structure.
Hybrid Structure
- Sweep
- Sweep will not get executed after the Sweep structures are closed.
- Pool
- On structure closure authorization, system will immediately liquidate and allocate the interest to all the accounts in the structure.
- System will disable the ‘IC required’ flag from ‘Yes’ to ‘No’ for the Notional Header and will stop doing further interest accruals for the structure.
- During the reopening of the structure, user should update the relevant account groups to the Notional header and system will resume interest accruals for the structure.
Specify User
ID and Password, and login to
Home screen.
Parent topic: Structure Maintenance