11.2 Post Domain Creation Configurations

You need to complete the configurations after the creation of the domain and cluster, and verification of the configuration details in the WebLogic Server.

The prerequisites are as follows:
  1. Make sure that the domain and cluster are created for the Oracle Banking Branch.

  2. Start the admin server, node manager, and managed servers. For information on how to start, refer to the documentation library of the Oracle Fusion Middleware.

To perform the configurations:

  1. Navigate to folder path /user_projects/domains/XXXXdomainNameXXX/servers/AdminServer/security in the machine.
  2. Create boot.properties file under /user_projects/domains/XXXXdomainNameXXX/servers/AdminServer/security.
  3. Edit boot.properties and specify username and password.
  4. Navigate to /user_projects/domain/sms_domain/bin.
  5. Run startWeblogic.cmd.

    Note:

    If the operating system is Linux, specify the file extension as .sh.
  6. Navigate to /user_projects/domains/sms_domain/bin.
  7. Run setNMJavaHome.cmd.

    Note:

    If the operating system is Linux, specify the file extension as .sh.
  8. Navigate to /user_projects/domains/sms_domain/nodemanager.
  9. Edit nodemanager.properties as required.

    Note:

    If the SSL and keystore are not provided, update securelistner = false.
  10. Perform the following steps in the Oracle WebLogic Server.
    1. On the Homepage, in the Domain Structure panel, click Machines.
    2. Click on the machine name.
    3. Click Node Manager, and select Type as Plain.
    4. Click Save to save the configured details.
  11. Navigate to /user_projects/domains/sms_domain/bin.
  12. Run startNodeManager.cmd.

    Note:

    If the operating system is Linux, specify the file extension as .sh.
  13. Start all the managed servers.
  14. In the Oracle WebLogic Server, verify the servers and clusters. For information on how to verify, refer to Verify Configuration Details.