2.2.3.1 Preparing to Install New Servers
Before you install a new server, prepare the rack unit for the server installation.
- 
                        Identify the rack unit where the server will be installed. Fill the first available unit, starting from the bottom of the rack. 
- 
                        Remove and discard the trough, which attaches the cable harness when no server is installed in the unit. 
- 
                        Remove and discard the solid filler. 
Parent topic: Adding New Servers