Recording Labor
Labor represents the amount of human resources (man hours) used to produce goods and services during a manufacturing operation.
To record labor:
-
Go to Advanced Manufacturing > Data Collection > Enter Results/Loss/Downtime/Labor.
-
Click the Labor subtab.
-
Enter the time the labor resource was assigned to the operation in the Start Time field.
Use the 7/11/2020 7:25:04 am format.
-
Enter the total labor hours to charge against the operation in the Duration (Hrs) field.
-
Select the Labor Code.
For example, general assembler, quality engineer, or supervisor.
-
Enter the total number of resources the operation used in the Resource Count field.
-
(Optional) Select the Asset Name.
If you do not select an asset, NetSuite uses the asset the work order was scheduled for.
-
(Optional) Select the name of the Employee who entered the data.
-
Click Save.
This information is tracked and associated with the work order.