Changing a Point of View Status

To change the status of a single point of view:

  1. On the Calculation Control page, select a point of view, and click Change Status icon in the Actions column.

  2. Click the drop-down in the Status column and select an option:

    • Draft: This is the default selection.

    • Published: Select this option if the POV has already been published. (You cannot run calculations on a published POV.)

    • Archived: Select this option if the POV is archived. (You cannot run calculations on an archived POV.)

To change the status of one or more points of view:

  1. On the Calculation Control page, select one or more points of view.

  2. Click the More Actions drop-down, and select Change Status.

  3. In the Change Item(s) dialog box, select a new status from the drop-down, and then click Submit.