Activate the Integration
Activate the Integration
After you complete the integration with a desired XML Gateway message, you can activate the integration.
- In the navigation pane, click Design, then Integrations.
- On the Integrations page, hover your cursor over the PROCESS PO integration, then click Activate
.
-
The Activate integration panel appears. Select the level of tracing appropriate to your integration. Click Activate to confirm the action.
Notice that the status of the "PROCESS PO" integration changes to ACTIVE.
Record the Integration Endpoint in Oracle Integration
After activating the integration, you need to obtain the integration endpoint URL by clicking Actions and then selecting Run for the "PROCESS PO" integration. Record the endpoint URL information.
In this example, the endpoint URL should be like:
https://<Oracle Integration Host>:<Port>/ic/api/integration/v1/flows/ebusiness/PROCESS_PO/1.0/metadata
This recorded integration endpoint URL (without the metadata
at the
end) will be used as the protocol address value when defining a trading partner in the
post integration configuration, as described in Configure Trading Partner Information for Post Integration.