Defaults
These processing options specify the default processing.
- 1. Enter the Critical Work Center Code to be displayed or blank for all Work Centers
Specify a code that indicates whether the work center is critical or not critical when the system calculates capacity. Values are:
N: Not a critical work center.
1: A critical work center in calculating RRP only.
2: A critical work center in calculating RCCP and CRP.
3: A critical work center in calculating RRP, RCCP, and CRP. The system also displays Type 3 work centers when you select Type 1 or Type 2 in this field.
4: Not a capacity work center. The system does not include this work center in capacity planning.
Note: The data selection is a system feature that processes certain groups of information with the RRP, RCCP, and CRP programs.- 2. Enter the Capacity Mode
Specify a code indicating which planning is being used. Values are:
1: Resource Requirements
2: Rough Cut Capacity
3: Capacity Requirements
- 3. Enter the default Unit of Measure
Specify a UDC (00/UM) that identifies the unit of measurement for an amount or quantity. For example, it can represent a barrel, box, cubic meter, liter, hour, and so on.