JD Edwards EnterpriseOne Product Costing and Manufacturing Accounting Reports: A to Z

This table lists the JD Edwards EnterpriseOne Product Costing and Manufacturing Accounting reports, sorted alphanumerically by report ID.

Report ID and Report Name

Description

Navigation

R30440

Costed Bill of Material Report

Reviews the total cost of parent items detailed by component costs. Use this information to develop more accurate financial plans by monitoring product costs.

Product Costing Reports (G3023), Costed Bill

R30445A

Multi-Level Costed Bill Report

Reviews lists of the total cost of parent items detailed by component costs. Use this information to develop more accurate financial plans by monitoring product costs.

Product Costing Reports (G3023), Multi Level Costed Bill

R30543

Cost Component/Ledger Integrity

Compares the sum of the frozen standard cost components for an item on the Enter Cost Components form (W30026B) and the unit cost in the Item Cost table (F4105) and reviews the variances.

Product Costing Reports (G3023), Cost Integrity

R31401

Accounting Summary (Closed Work Orders)

Lists completed work orders and their accumulated costs. This report lists the total standard and actual costs and the variance between the two. Actual costs are detailed by material, labor, and overhead.

  • Manufacturing Acctg Reports (G3123), Discrete Summary of Costs by Order

  • Manufacturing Acctg Reports (G3123), Process Summary of Costs by Order

R31425

Purchase Price Variance Report

Lists the actual price paid for an item, the standard price that you estimated for the item, and the variance between the two. It also lists a percent of variance for each item and the total costs by item for the entire report.

  • Manufacturing Acctg Reports (G3123), Discrete Material Price Variance

  • Manufacturing Acctg Reports (G3123), Discrete Material Price Variance

R31426

Material Usage Variances Report

Lists the standard costs on a work order parts list and the actual costs recorded for the parts issued.

  • Manufacturing Acctg Reports (G3123), Discrete Material Usage Variance - Std.

  • Manufacturing Acctg Reports (G3123), Process Material Usage Variance - Std.

R314271

Labor Rate Variance Report

Lists current and standard labor rates, and hours or amounts. It details labor rate variances between the standard rates that you estimated and the actual rates that you charged, and lists the percentage of variance.

  • Manufacturing Acctg Reports (G3123), Discrete Labor Rate Variance

  • Manufacturing Acctg Reports (G3123), Process Labor Rate Variance

R31428

Work Order Labor Efficiency Report

Provides a detailed analysis of direct labor efficiency hours accumulated for a work order. It lists standard and actual hours, and calculates the cost of the variance between them based on standard labor rates.

  • Manufacturing Acctg Reports (G3123), Discrete Labor Efficiency

  • Manufacturing Acctg Reports (G3123), Process Labor Efficiency

R31811

Completed Work Order Valuation

Displays the standard, actual, completed, and outstanding balance amounts by cost component and item for completed work orders. The Manufacturing Journal Entries program (R31802A) and the Variances program (R31804) have already been run for these work orders. The report displays the total for each type of cost by work order and a grand total of each cost for all of the work orders listed.

Manufacturing Acctg Reports (G3123), Discrete Completed Order Valuation

R31812A

Work Order Activity - Amounts

Lists standard, current, planned, actual, and completed amounts of work orders. The report lists the costs of the components first, and then the costs of the parents.

Manufacturing Accounting (G3116), Work Order Activity - Amounts

R31812B

Work Order Activity - Units

Lists the standard, current, planned, actual, and completed units of work orders. The report lists the costs of components first, and then the costs of the parents.

Manufacturing Accounting (G3116), Work Order Activity - Units

R31813

Engineering Variance

Lists work orders, their standard and current amounts, and their engineering variances.

Manufacturing Acctg Reports (G3123), Discrete Engineering Variance

R31814

Planned Variance

Lists all work orders and their planned variances. The purpose of the report is to compare the current amounts to planned amounts.

Manufacturing Acctg Reports (G3123), Discrete Planned Variance

R31816

Labor Efficiency Variances

Displays planned and actual labor hours (all cost components except A1), extended by standard rates, and the monetary amount of variance by work order and item number.

Manufacturing Acctg Reports (G3123), Discrete Labor Efficiency Variances

R31817

Total/WIP and Other Variances

Displays the standard, actual, and completed amounts, as well as total and other variances by cost component and item for work orders.

Manufacturing Acctg Reports (G3123), Discrete Total/WIP and Other Variances

R31818

Work Order Variances - Amounts

Displays detailed production costs and variance amounts for work orders.

Manufacturing Acctg Reports (G3123), Discrete Completed Order Variances