Prerequisite Setup

Forecasts and sales orders were entered for nine time periods. Verify that the MRP Time Periods processing option in the MPS Regeneration program (R3482) is set to 9 periods and that the Periods in MRP Window field in the Kanban Size Calculation Parameter Definition program (P3018) is set to 9.

The MRP Regeneration program ran for five days, three weeks, and one month. The resulting time series is:

Date

FSCU Quantity

SOU Quantity

Highest Value

February 2

100

30

100

February 3

200

40

200

February 4

300

50

300

February 5

300

50

300

February 6

200

100

200

February 13

200

100

200

February 20

300

200

300

February 27

250

200

250

March 31

100

200

200

The calculation method has been set up using the Kanban Size Calculation Definition program. The calculation method has calculation-specific parameter values, as defined in the Kanban Size Calculation Parameter Definition program:

Parameter

Parameter Value

Periods in MRP window

9

Days built per week

5

Days built per month

20

Scan delta days

1

Lead time delivery (days)

2

Vendor split percent

0

Safety stock

50

Demand split percent

100

Container size

50

Minimum kanban size

20

Maximum kanban size

60