MRP Schedule Generation for Kanban Management

When you run a material requirements planning (MRP) generation, the system explodes the component demand and stores them in time series buckets. When the component item is kanban-controlled, the system generates the planning schedule and associated planning messages. However, you cannot view or process these messages. You run the MRP generation for kanban-controlled items only to generate the demand. All replenishment action for kanban-controlled items should originate from the Kanban Processing program (P3157).

A kanban that is sourced by a work center creates a work order or a rate schedule that generates component demand requirements in MRP. MRP creates planning messages for a kanban-controlled item and its components. You cannot use messages that are generated for a kanban-controlled item to initiate replenishment.

A kanban that is sourced by an outside supplier initiates replenishment through a purchase order. MRP generates order messages for such items, but they cannot be processed.

When the MRP generation is complete, MRP messages for kanban items do not appear in the MRP Detail Message Review program (P3411). The system does not allow the processing of messages for kanban items in the MRP Detail Message Review program (P3411) or the MRP/MPS Detail Message Processing program (R3411).

Note: The system does not differentiate the messages for kanban items from messages for regular items in any way other than disallowing processing.

All other MRP processing, such as pegging, time series, multiplant, minimum, and maximum, works the same way for kanban-controlled items as it does for regular items.

When MRP generation is complete, you can generate the demand schedule and send information to the supplier.