Demand Flow Manufacturing Reports: A to Z

The following table lists the JD Edwards EnterpriseOne Demand Flow Manufacturing reports, sorted alphabetically by Report ID.

Report ID and Report Name

Description

Navigation

RF30L110

Standard Sequence of Events - Print

Print the standard sequence of events that you have created for a process.

Sequence of Events Management (GF30L22), Standard Sequence of Events

Click the Edit button on the Search for Standard Sequence of Events form.

Click the Save and Print SSOE button.

RF30L115

Sequence of Events

Print the sequence of events that you have created for an item and process.

Sequence of Events Management (GF30L22), Sequence of Events

Click the Edit button on the Search for Sequence of Events form.

Click the Save and Print button.

RF30L704

Product Synchronization Results

Print a table listing the processes included in the product synchronization as well as the calculation results for throughput, output and scrap.

Line Design Management (G30L21), Product Synchronizations

Click the Print Last Calculated button on the Manage Product Synchronizations form.

RF30L950

DFM Operational Definition

Print operational definition header records.

Line Design Management (G30L21), Operational Definition

Click the Find and then the Define button on the Search for Operational Definition form.

Click the Print button on the Define Operations form.

RF30L951

DFM Operational Definition Detail

Print the operational definition detail records.

Line Design Management (G30L21), Operational Definition Maintenance

Click the Find and then the Manage Operational Definition button on the Search for Operational Definition form.

Click the Print button on the Manage Calculated Operational Definition form.

RF34R012A

Print Daily Simulation Results

After creating a resource simulation, print a report of the results.

Click the Print button on the Execute Resource Simulation form.

RF34S003

Daily Plan

Print daily plan information based on a user-defined data selection.

Demand Flow Daily Management (GF30L11), Print Daily Plan

RF34S004

Daily Sequence Report

Print the sequence records you generated for a daily plan.

Demand Flow Daily Management (GF30L11), Print Daily Sequence

R8930L501P

Post Install for FF30L501/FF30L701/FF30L905/FF30L912-811SP1

(Optional)

If you have installed a release prior to JD Edwards EnterpriseOne 8.11 SP1, run this batch program to update the work center branch/plant field in several tables within a scenario for integration with JD Edwards Enterprise One base Manufacturing.

Select R8930L501P from Batch Versions.