Demand Flow Manufacturing Reports: A to Z
The following table lists the JD Edwards EnterpriseOne Demand Flow Manufacturing reports, sorted alphabetically by Report ID.
Report ID and Report Name |
Description |
Navigation |
---|---|---|
RF30L110 Standard Sequence of Events - Print |
Print the standard sequence of events that you have created for a process. |
Sequence of Events Management (GF30L22), Standard Sequence of Events Click the Edit button on the Search for Standard Sequence of Events form. Click the Save and Print SSOE button. |
RF30L115 Sequence of Events |
Print the sequence of events that you have created for an item and process. |
Sequence of Events Management (GF30L22), Sequence of Events Click the Edit button on the Search for Sequence of Events form. Click the Save and Print button. |
RF30L704 Product Synchronization Results |
Print a table listing the processes included in the product synchronization as well as the calculation results for throughput, output and scrap. |
Line Design Management (G30L21), Product Synchronizations Click the Print Last Calculated button on the Manage Product Synchronizations form. |
RF30L950 DFM Operational Definition |
Print operational definition header records. |
Line Design Management (G30L21), Operational Definition Click the Find and then the Define button on the Search for Operational Definition form. Click the Print button on the Define Operations form. |
RF30L951 DFM Operational Definition Detail |
Print the operational definition detail records. |
Line Design Management (G30L21), Operational Definition Maintenance Click the Find and then the Manage Operational Definition button on the Search for Operational Definition form. Click the Print button on the Manage Calculated Operational Definition form. |
RF34R012A Print Daily Simulation Results |
After creating a resource simulation, print a report of the results. |
Click the Print button on the Execute Resource Simulation form. |
RF34S003 Daily Plan |
Print daily plan information based on a user-defined data selection. |
Demand Flow Daily Management (GF30L11), Print Daily Plan |
RF34S004 Daily Sequence Report |
Print the sequence records you generated for a daily plan. |
Demand Flow Daily Management (GF30L11), Print Daily Sequence |
R8930L501P Post Install for FF30L501/FF30L701/FF30L905/FF30L912-811SP1 |
(Optional) If you have installed a release prior to JD Edwards EnterpriseOne 8.11 SP1, run this batch program to update the work center branch/plant field in several tables within a scenario for integration with JD Edwards Enterprise One base Manufacturing. |
Select R8930L501P from Batch Versions. |