Assigning a Not-to-Exceed Rule to a Change Order
Access the Contract Billing Line Detail Revisions form. Select the Not to Exceed tab.

The Not to Exceed tab is displayed only if the Not To Exceed Control check box is selected on the Billing Constants program (P48091).