Example 1 — Flow Stops
In the example below, the value from stage A ($100) is allocated to B1, B2, and B3.

The values from B1 and B2 are allocated to C1 and C2 respectively; however, B3 has no further assignments. In this example, the $50 from B3 will be reported under UnassignedCost
or UnassignedRevenue
in the Measures dimension.