Override Receipt Methods at Appropriate Levels for Settlement Accounting as Required
As Receipt Method derives the accounting entries for settlement transaction it is critical to have ability to derive it at appropriate level. This feature enables the user to configure the derivation of receipt method at Performance level in addition to existing OU and project level. This provides the flexibility to derive different receipt methods for various schedules and performances, ensuring appropriate accounting entries.
Prior to Release 12.2.15, receipt methods are derived only at the OU and Project levels.
The Client Extension, PA_Client_Extn_IGT_Cust.custom_receipt_method, is provided for receipt method derivation at the performance level:
Name: PA_Client_Extn_IGT_Cust.custom_receipt_method
Excepted Behavior: Derive the receipt method during the performance settlement.
Output: Receipt Method
Parameters:
- Order Number
- Order Line Number
- Order Line Schedule Number
- Agency Location Code
- Customer Number/Name
- Performance Number
- Accounting Period
- Existing Receipt Method
- Required Receipt Method
- IPAC document reference number
The system considers the following precedence for receipt method generation:
- Client extension
- Project level setup
- Operating Unit level setup
Steps to Enable
You don't need to do anything to enable this feature.
Key Resources
Refer to Overriding Receipt Method When Pulling the Settlement topic in Chapter 6 Using G-Invoicing: Servicing Agency of the Oracle E-Business Suite G-Invoicing Process Guide for more details.