Validating a migration

Before you can run a job with a migration resource in Oracle Cloud Infrastructure Database Migration, the migration resource must be validated.

  1. In the list of migrations on the Migrations page, select Validate from the Actions (three dots) menu for the migration you want to validate.
    You can also select Validate on the Migration Details page.
  2. In the Validate Migration dialog, click Validate.
  3. Click Jobs on the left side of the page to monitor the status of a validation job.

    In the Jobs table the validation job is listed with type Evaluation.

If you enabled the Cloud Pre-migration Advisor Tool (CPAT) to run during the validation job, the CPAT report and details about any failed checks are found in the Job Details page. See Configuring validation options and Checking the Premigration Advisor Report for more information.