Perform a visual inspection to confirm that the leaf switches and spine switches in each rack (Exalogic machines and Exadata Database Machine) have the correct number of InfiniBand connections. You should also verify that the ports in the leaf switch are occupied. You should also verify that each spine switch has the correct number of cables coming into it.